A platform for research: civil engineering, architecture and urbanism
Interesting factory structure with prestressed precast arch frames
Factory for precast concrete, and offices and workshops for Matthews and Mumby Ltd at Denton, near Manchester; 15 ft wide V-shaped arches supported on tapering, V-shaped columns are used; each frame consists of 22 precast elements; there are three V-shaped, tapering elements in each column; erection method. (See also Civ Eng (Lond) v 50 n 593 Nov 1955 p 1243-4)
Interesting factory structure with prestressed precast arch frames
Factory for precast concrete, and offices and workshops for Matthews and Mumby Ltd at Denton, near Manchester; 15 ft wide V-shaped arches supported on tapering, V-shaped columns are used; each frame consists of 22 precast elements; there are three V-shaped, tapering elements in each column; erection method. (See also Civ Eng (Lond) v 50 n 593 Nov 1955 p 1243-4)
Interesting factory structure with prestressed precast arch frames
Concrete Constructional Eng
1955
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Interesting factory structure with prestressed precast arch frames
Engineering Index Backfile | 1955
Prestressed precast units for factory extension
Engineering Index Backfile | 1956
Seismic Performance of Reinforced Concrete Frames with Precast-Prestressed Flooring System
British Library Conference Proceedings | 2009
|Precast concrete factory structure
Engineering Index Backfile | 1955