A platform for research: civil engineering, architecture and urbanism
Interesting factory structure with prestressed precast arch frames
Factory for precast concrete, and offices and workshops for Matthews and Mumby Ltd at Denton, near Manchester; 15 ft wide V-shaped arches supported on tapering, V-shaped columns are used; each frame consists of 22 precast elements; there are three V-shaped, tapering elements in each column; erection method. (see also Concrete and Constructional Eng v 50 n 9 Sept 1955 p 329-32)
Interesting factory structure with prestressed precast arch frames
Factory for precast concrete, and offices and workshops for Matthews and Mumby Ltd at Denton, near Manchester; 15 ft wide V-shaped arches supported on tapering, V-shaped columns are used; each frame consists of 22 precast elements; there are three V-shaped, tapering elements in each column; erection method. (see also Concrete and Constructional Eng v 50 n 9 Sept 1955 p 329-32)
Interesting factory structure with prestressed precast arch frames
Civ Eng (Lond)
Civil Engineering ; 50
1955
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Interesting factory structure with prestressed precast arch frames
Engineering Index Backfile | 1955
Prestressed precast units for factory extension
Engineering Index Backfile | 1956
Seismic Performance of Reinforced Concrete Frames with Precast-Prestressed Flooring System
British Library Conference Proceedings | 2009
|Precast concrete factory structure
Engineering Index Backfile | 1955