A platform for research: civil engineering, architecture and urbanism
High tensile bolts in erection of steel bridge
Substructure of high level bridge over Burdekin river, Australia; high tensile steel bolts are tightened by means of impact wrench to tension of 70,000 psi; bolts are set in clearance holes and held by friction developed between clamped surfaces; 300,000 bolts assembled and tightened during construction.
High tensile bolts in erection of steel bridge
Substructure of high level bridge over Burdekin river, Australia; high tensile steel bolts are tightened by means of impact wrench to tension of 70,000 psi; bolts are set in clearance holes and held by friction developed between clamped surfaces; 300,000 bolts assembled and tightened during construction.
High tensile bolts in erection of steel bridge
Commonwealth Engr
1956
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1952
Floating rigs, high-strength bolts cut girder bridge erection time
Engineering Index Backfile | 1956
Steel Bridge Erection Practices
NTIS | 2005
|Engineering Index Backfile | 1911
|Welded erection seat eliminates field bolts in welded steel frame
Engineering Index Backfile | 1931
|