A platform for research: civil engineering, architecture and urbanism
Design and erection of balanced arch bridge across Arakawa, at Chichibu, Saitama-prefecture
Trussed arch bridge having main span 280.5 ft. long and 90 ft. rise.
Design and erection of balanced arch bridge across Arakawa, at Chichibu, Saitama-prefecture
Trussed arch bridge having main span 280.5 ft. long and 90 ft. rise.
Design and erection of balanced arch bridge across Arakawa, at Chichibu, Saitama-prefecture
Civil Eng. Soc. -- Jl
Masuda, J. (author)
1931
12 pages
6 Figs., 6 Supp. plates
Article (Journal)
Japanese
© Metadata Copyright Elsevier B. V. All rights reserved.
Earthquake Disaster Countermeasures in Saitama Prefecture, Japan
British Library Conference Proceedings | 1994
|British Library Online Contents | 2015
|Closure to Erection of Arch Bridge
ASCE | 2021
|Discussion on Erection of Arch Bridge
ASCE | 2021
|Reconstruction of Arakawa river bridge
Engineering Index Backfile | 1967