A platform for research: civil engineering, architecture and urbanism
Subway construction, frankfurter allee in Berlin
In construction of 1.1 mi. extension of subway system, excavating and scaffolding were carried out under great difficulties to avoid interference with street traffic; two mixers with 1 yd. capacity each handled 78,500 cu. yd. of concrete; floor of tunnel consists of several layers of reinforced concrete (1:5) with protective coatings of asphalt and bitumen. (see also brief translated abstract in Am. Concrete Inst. -- Jl., vol. 2, no. 6, Feb. 1931, pp. 181-182)
Subway construction, frankfurter allee in Berlin
In construction of 1.1 mi. extension of subway system, excavating and scaffolding were carried out under great difficulties to avoid interference with street traffic; two mixers with 1 yd. capacity each handled 78,500 cu. yd. of concrete; floor of tunnel consists of several layers of reinforced concrete (1:5) with protective coatings of asphalt and bitumen. (see also brief translated abstract in Am. Concrete Inst. -- Jl., vol. 2, no. 6, Feb. 1931, pp. 181-182)
Subway construction, frankfurter allee in Berlin
Untergrundbahnbau Berlin, Frankfurter Allee
Bautechnik ; 8
1930
3 pages
9 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.