A platform for research: civil engineering, architecture and urbanism
Work done at Schluchsee hydroelectric power plant
Progress report on construction of concrete lined pressure tunnel, 6 km. long 4.1 m. in diam., concrete arch dam 42 m. high, power plants, etc.
Work done at Schluchsee hydroelectric power plant
Progress report on construction of concrete lined pressure tunnel, 6 km. long 4.1 m. in diam., concrete arch dam 42 m. high, power plants, etc.
Work done at Schluchsee hydroelectric power plant
Die Arbeiten am Schluchseewerk
V.D.I. Zeitschrift ; 75
1931
2 pages
4 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Schluchsee Hydroelectric Plant
Engineering Index Backfile | 1930
|New methods in construction of eichholz tunnel of schluchsee hydroelectric power development
Engineering Index Backfile | 1930
|Forstlicher Erholungsplan Schluchsee
TIBKAT | 1976
|