A platform for research: civil engineering, architecture and urbanism
Pack dam construction, equipment, concrete mixing and foundation consolidation
Construction of curved gravity dam having maximum height of 33 m., 200 m. long, located in western Styria; concrete proportioning, placing and grouting. (See also - nos. 29-30 and 31-July 24, 1931, pp. 235-237)
Pack dam construction, equipment, concrete mixing and foundation consolidation
Construction of curved gravity dam having maximum height of 33 m., 200 m. long, located in western Styria; concrete proportioning, placing and grouting. (See also - nos. 29-30 and 31-July 24, 1931, pp. 235-237)
Pack dam construction, equipment, concrete mixing and foundation consolidation
Einiges ueber Installation, Betonzusammensetzung und Untergrunddichtung beim Bau der Packsperre
Goldemund, H. (author)
1931
3 pages
14 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Bidirectional cement mixing pile composite soil consolidation foundation device
European Patent Office | 2023
|Cofferdam backfill consolidation foundation and construction method
European Patent Office | 2021
|FOUNDATION CONSOLIDATION STRUCTURE OF SEABED AND FOUNDATION CONSOLIDATION METHOD
European Patent Office | 2022
|Foundation concrete pouring equipment for building construction
European Patent Office | 2023
|