A platform for research: civil engineering, architecture and urbanism
FOUNDATION CONSOLIDATION STRUCTURE OF SEABED AND FOUNDATION CONSOLIDATION METHOD
To eliminate a gap between peripheral surfaces of bagging units easily, and to improve a bearing force (toughening) of a foundation consolidation structure while effectively suppressing suction and corrosion of sediment.SOLUTION: A plurality of bagging units 10 and a fiber filling cushioning material 30 are combined, the filling cushioning material 30 is filled in a gap S formed between the plurality of bagging units 10 precedently laid on a seabed, and an integrally structured foundation consolidation structure 60 is formed by inseparably connecting the gap between these members 10 and 30 by a connection member 50.SELECTED DRAWING: Figure 1
【課題】袋詰ユニットの周面間の隙間を簡易に解消できて、土砂の吸出しと洗掘を効果的に抑制しつつ、根固め構造体の耐力(強靭化)の向上を図ること。【解決手段】複数の袋詰ユニット10と繊維製の間詰緩衝材30を併用し、海底地盤に先行敷設した複数の袋詰ユニット10の間に形成される隙間S内に間詰緩衝材30を間詰めし、これらの部材10,30の間を連結材50で離隔不能に連結して一体構造の根固め構造体60を形成する。【選択図】図1
FOUNDATION CONSOLIDATION STRUCTURE OF SEABED AND FOUNDATION CONSOLIDATION METHOD
To eliminate a gap between peripheral surfaces of bagging units easily, and to improve a bearing force (toughening) of a foundation consolidation structure while effectively suppressing suction and corrosion of sediment.SOLUTION: A plurality of bagging units 10 and a fiber filling cushioning material 30 are combined, the filling cushioning material 30 is filled in a gap S formed between the plurality of bagging units 10 precedently laid on a seabed, and an integrally structured foundation consolidation structure 60 is formed by inseparably connecting the gap between these members 10 and 30 by a connection member 50.SELECTED DRAWING: Figure 1
【課題】袋詰ユニットの周面間の隙間を簡易に解消できて、土砂の吸出しと洗掘を効果的に抑制しつつ、根固め構造体の耐力(強靭化)の向上を図ること。【解決手段】複数の袋詰ユニット10と繊維製の間詰緩衝材30を併用し、海底地盤に先行敷設した複数の袋詰ユニット10の間に形成される隙間S内に間詰緩衝材30を間詰めし、これらの部材10,30の間を連結材50で離隔不能に連結して一体構造の根固め構造体60を形成する。【選択図】図1
FOUNDATION CONSOLIDATION STRUCTURE OF SEABED AND FOUNDATION CONSOLIDATION METHOD
海底地盤の根固め構造および根固め方法
SUZUKI KOUJIROU (author) / ISHIZAKA OSAMU (author)
2022-12-13
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
FOUNDATION STRUCTURE, METHOD FOR CONSTRUCTING FOUNDATION STRUCTURE, AND CONSOLIDATION SUPPORT MEMBER
European Patent Office | 2018
|Consolidation of embankment and foundation materials
Engineering Index Backfile | 1940
Consolidation work for Grancarevo dam foundation
Engineering Index Backfile | 1965
|