A platform for research: civil engineering, architecture and urbanism
Reconstruction of the Catawba hydroelectric power plant (U.S.)
Plant, its machinery and dam is described; four turbines give 20,000 hp. at 100 r.p.m. with 20 m. fall.
Reconstruction of the Catawba hydroelectric power plant (U.S.)
Plant, its machinery and dam is described; four turbines give 20,000 hp. at 100 r.p.m. with 20 m. fall.
Reconstruction of the Catawba hydroelectric power plant (U.S.)
La refection de l'usine hydro-electrique de Catawba (Etats-Unis)
Genie Civil ; 92
1928
3 pages
3 Figs.
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Foreign experience with hydroelectric plant reconstruction
Springer Verlag | 1978
|Foreign experience with hydroelectric plant reconstruction
Online Contents | 1978
|