A platform for research: civil engineering, architecture and urbanism
Intake works of power station to utilize water of Velino river are described; length of supply conduits is 22 m.; power station will be equipped with 8 Escher Wyss turbines of 50,000 hp. each; upstream tunnels, canal and principal tunnel are described in detail.
Intake works of power station to utilize water of Velino river are described; length of supply conduits is 22 m.; power station will be equipped with 8 Escher Wyss turbines of 50,000 hp. each; upstream tunnels, canal and principal tunnel are described in detail.
Hydroelectric power plant at Galleto, Italy
L'usine hydro-electrique de Galleto (italie)
Dantin, C. (author)
Genie Civil ; 93
1928
4 pages
13 Figs.
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Roselend hydroelectric power plant
Engineering Index Backfile | 1960
|Engadin hydroelectric power plant
Engineering Index Backfile | 1967
|