A platform for research: civil engineering, architecture and urbanism
Preliminary work on hydroelectric power development for British Columbia electric railway; first step in project which will add approximately 625,000 hp. to company's resources on mainland; contract let for 2 1/2-mile tunnel; Bridge River project consists of diverting waters of Bridge River through tunnel into Seton Lake and utilizing head, thus made available, for production of hydroelectric power.
Preliminary work on hydroelectric power development for British Columbia electric railway; first step in project which will add approximately 625,000 hp. to company's resources on mainland; contract let for 2 1/2-mile tunnel; Bridge River project consists of diverting waters of Bridge River through tunnel into Seton Lake and utilizing head, thus made available, for production of hydroelectric power.
Power development at Bridge river
Engr
Can, B.C. (author)
Engineer ; 54
1928
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
|Engineering Index Backfile | 1958
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1889
Engineering Index Backfile | 1968
|