A platform for research: civil engineering, architecture and urbanism
Descriptive report of works estimated to cost $90,000; wharf or pier at port of Dolores on Salvador river; affluent of Uruguay river, first of all-reinforced-concrete type to be built on interior rivers of Uruguay.
Descriptive report of works estimated to cost $90,000; wharf or pier at port of Dolores on Salvador river; affluent of Uruguay river, first of all-reinforced-concrete type to be built on interior rivers of Uruguay.
Dolores wharf extension works
Obras de Ampliacion en el Muelle de Dolores
Rodriquez, F.A. (author)
1928
5 pages
2 Figs. on supp. plates
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 2004
|Apapa wharf extension at Lagos
Engineering Index Backfile | 1956
Apapa wharf extension at Lagos
Engineering Index Backfile | 1956