A platform for research: civil engineering, architecture and urbanism
Pour 4000 yards of concrete in 12 days
Multi-compartment grain elevator in Denver goes up fast with slip-form system; solid concrete construction, 128 ft. long, 50 ft. wide, 100 ft. high; Burrell system; permits pouring of beams and girders monolithically with walls and columns as work progresses upward and saves much formwork and duplicated effort; practice was used which permitted setting of steel sash as walls progressed.
Pour 4000 yards of concrete in 12 days
Multi-compartment grain elevator in Denver goes up fast with slip-form system; solid concrete construction, 128 ft. long, 50 ft. wide, 100 ft. high; Burrell system; permits pouring of beams and girders monolithically with walls and columns as work progresses upward and saves much formwork and duplicated effort; practice was used which permitted setting of steel sash as walls progressed.
Pour 4000 yards of concrete in 12 days
Am. Contractor
American Contractor ; 49
1928
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
100,000 cubic yards moved in 64 working days
Engineering Index Backfile | 1931
|Million yards concrete for dam
Engineering Index Backfile | 1943
Placing 300,000 cubic yards of concrete
Engineering Index Backfile | 1914
Pouring 1600 cu yards of concrete per day
Engineering Index Backfile | 1922
Layout and equipment of government concrete ship yards
Engineering Index Backfile | 1919
|