A platform for research: civil engineering, architecture and urbanism
Description of storm sewers and drainage system; method of computing storm run-off; details of pumping plant of ultimate capacity of 4.5 cu. m. per sec. and present capacity of 2.5 cu. m. per sec.; architectural treatment; system of steel reinforcement; effect of mining operations on walls. (See also - no. 20 May 11 1928, pp. 263-267)
Description of storm sewers and drainage system; method of computing storm run-off; details of pumping plant of ultimate capacity of 4.5 cu. m. per sec. and present capacity of 2.5 cu. m. per sec.; architectural treatment; system of steel reinforcement; effect of mining operations on walls. (See also - no. 20 May 11 1928, pp. 263-267)
Schwelgern drainage pumping plant at Hamborn on the Rhine
Das Abwasserpumpwerk Schwelgern in Hamborn am Rhein
Carp, H. (author)
Bautechnik ; 6
1928
3 pages
25 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Foundations of Gas-Engine Plant in Hamborn, Germany
Engineering Index Backfile | 1930
Der Bau des Silos 4 im Zementwerk Schwelgern
UB Braunschweig | 1990
|