A platform for research: civil engineering, architecture and urbanism
Slumps complicate Garza Dam construction
Material in banks, largely clay balls formed in pipe line, flattened out and required change of slopes from one on three to one on ten or fifteen; for Dallas, Tex., water works; hydraulic fill adopted; construction sequence.
Slumps complicate Garza Dam construction
Material in banks, largely clay balls formed in pipe line, flattened out and required change of slopes from one on three to one on ten or fifteen; for Dallas, Tex., water works; hydraulic fill adopted; construction sequence.
Slumps complicate Garza Dam construction
Eng. News-Rec
Nagle, J.C. (author) / Shuler, T.C. (author)
Engineering News Record ; 100
1928
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Foundation problems complicate construction of Calderwood dam
Engineering Index Backfile | 1930
River, railway, highway complicate sewer construction
Engineering Index Backfile | 1949
|Foundation problems complicate construction of Calderwood dam
Engineering Index Backfile | 1930
California Soil Slumps and Debris Flows
British Library Conference Proceedings | 1985
|Floods complicate Mississippi bridge job
Engineering Index Backfile | 1944
|