A platform for research: civil engineering, architecture and urbanism
Cignano dam of Societa Idroelettrica Marmore, on Lap-lana tributary of Marmore river, being constructed with portland-cement concrete; material is placed by pouring method; gravel and sand excavated by power shovel from deposit 500 m. distant; concrete mixture based on factor of safety of 6; gravel 650, sand 650, cement 250, and water 210 parts; special mix for facing has 570, 630, 300, and 210 respectively; distributors are of Ransome type.
Cignano dam of Societa Idroelettrica Marmore, on Lap-lana tributary of Marmore river, being constructed with portland-cement concrete; material is placed by pouring method; gravel and sand excavated by power shovel from deposit 500 m. distant; concrete mixture based on factor of safety of 6; gravel 650, sand 650, cement 250, and water 210 parts; special mix for facing has 570, 630, 300, and 210 respectively; distributors are of Ransome type.
A poured-concrete dam
Una presa de hormigon colado
Becerril, E. (author)
1928
4 pages
9 Figs.
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Distributing systems for poured concrete
Engineering Index Backfile | 1925
|Engineering Index Backfile | 1928
|Practical experience with poured concrete
Engineering Index Backfile | 1914
|