A platform for research: civil engineering, architecture and urbanism
Larger capacity handled, quicker results; greater homogeneity in large masses; notable economy in work done; disadvantages are, greater amount of water required to cause material to circulate through troughs, and greater capital required for installation of accessories; detailed notes on preliminary tests for construction work by pouring system; data on construction of Waeggital dam in Switzerland.
Larger capacity handled, quicker results; greater homogeneity in large masses; notable economy in work done; disadvantages are, greater amount of water required to cause material to circulate through troughs, and greater capital required for installation of accessories; detailed notes on preliminary tests for construction work by pouring system; data on construction of Waeggital dam in Switzerland.
Some notes on poured concrete
Algunas notas sobre el hormigon colado
Marchesi, J.M. (author)
1928
3 pages
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Distributing systems for poured concrete
Engineering Index Backfile | 1925
|Practical experience with poured concrete
Engineering Index Backfile | 1914
|