A platform for research: civil engineering, architecture and urbanism
Construction time saved in winter by modern methods
Methods employed for 17-story reinforced-concrete structure on spread footings, with overall dimensions of approximately 46 ft. by 300 ft., irregular in shape; excavation and footings; concrete mixing plant; proportioning methods; high early strength; form system; winter protection.
Construction time saved in winter by modern methods
Methods employed for 17-story reinforced-concrete structure on spread footings, with overall dimensions of approximately 46 ft. by 300 ft., irregular in shape; excavation and footings; concrete mixing plant; proportioning methods; high early strength; form system; winter protection.
Construction time saved in winter by modern methods
Eng. Contracting
1928
4 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
College crisis Can the National Construction College be saved?
British Library Online Contents | 2007
Time and money saved on residential development
British Library Online Contents | 2006
|Novel piling method saved time on underpass
Engineering Index Backfile | 1963
|How Totty Construction saved the NHS more than GBP1m
British Library Online Contents | 2002