A platform for research: civil engineering, architecture and urbanism
Building cofferdams for Arlington bridge piers
Piling is driven and excavation is completed before bracing is installed; piers are founded on mud-covered rock at average depth of 38 ft. below water level; they are of concrete with granite facings to point 3 ft. below low water and measure about 44 by 140 ft. in plan.
Building cofferdams for Arlington bridge piers
Piling is driven and excavation is completed before bracing is installed; piers are founded on mud-covered rock at average depth of 38 ft. below water level; they are of concrete with granite facings to point 3 ft. below low water and measure about 44 by 140 ft. in plan.
Building cofferdams for Arlington bridge piers
Constr. Methods
Construction Methods ; 10
1928
4 pages
11 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Deep steel sheetpile cofferdams at Arlington bridge
Engineering Index Backfile | 1927
|Steel piling cofferdams for bridge piers
Engineering Index Backfile | 1906
Single bridge piers built in cellular cofferdams
Engineering Index Backfile | 1951
|Sheet pile cofferdams for the Arlington memorial bridge
Engineering Index Backfile | 1928
Single bridge piers built in cellular cofferdams
Engineering Index Backfile | 1951
|