A platform for research: civil engineering, architecture and urbanism
Boulder dam engineering board reports project feasible
Sets cost $40,000,000 higher than estimate; President Coolidge suggests favorable Congressional action; by far highest in world, Black Canyon dam would have crest height above low water of 550 ft., and would impound lake containing 26,000,000 acre-ft. of water; Board investigated at some length possible methods of construction; plan calls for building of two cofferdams, one 70 ft. and other 29 ft. above low-water level; power and irrigation. (see also Elec. World, vol. 92, no. 23, Dec. 8, 1928, p. 1160)
Boulder dam engineering board reports project feasible
Sets cost $40,000,000 higher than estimate; President Coolidge suggests favorable Congressional action; by far highest in world, Black Canyon dam would have crest height above low water of 550 ft., and would impound lake containing 26,000,000 acre-ft. of water; Board investigated at some length possible methods of construction; plan calls for building of two cofferdams, one 70 ft. and other 29 ft. above low-water level; power and irrigation. (see also Elec. World, vol. 92, no. 23, Dec. 8, 1928, p. 1160)
Boulder dam engineering board reports project feasible
Power
Power ; 68
1928
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Boulder dam engineering board reports project feasible
Engineering Index Backfile | 1928
Colorado river board reports on Boulder dam project
Engineering Index Backfile | 1929
Feasible Boulder treatment methods for soft ground shielded TBM
British Library Conference Proceedings | 2007
|Engineering Index Backfile | 1930