A platform for research: civil engineering, architecture and urbanism
Tailing disposal at Mufulira
Problems of tailing disposal and methods to be used in construction of Mufulira's new tailing dam; lake formed behind new dam will cover 3000 acres and will have ultimate capacity of 170,000,000 tons; tailing will be disposed at rate of 300,000 tons per mo; use of cyclones and details on construction of dam.
Tailing disposal at Mufulira
Problems of tailing disposal and methods to be used in construction of Mufulira's new tailing dam; lake formed behind new dam will cover 3000 acres and will have ultimate capacity of 170,000,000 tons; tailing will be disposed at rate of 300,000 tons per mo; use of cyclones and details on construction of dam.
Tailing disposal at Mufulira
Min J
Mining Journal ; 253
1959
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Subaqueous Tailing Disposal: A Sound Solution for Reactive Tailing
British Library Conference Proceedings
|The reclamation of mica flakes from tailing disposal using gravity separators and flotation
DOAJ | 2016
|British Library Online Contents | 2000
|Tailing pond dam body, tailing pond and stacking method of tailing pond dam body
European Patent Office | 2023
|Tailing pond intercepting ditch and tailing pond intercepting system
European Patent Office | 2021
|