A platform for research: civil engineering, architecture and urbanism
Zambezi hydro-electric development at Kariba, first stage
Scheme comprises double-curvature concrete arch dam, 420 ft high, and underground power house to accommodate 6 turbogenerators, each of 100-Mw capacity; design and construction was completed in 4 1/2 yr; construction of dam provided lake of 2000 sq mi; planning and organization of construction work.
Zambezi hydro-electric development at Kariba, first stage
Scheme comprises double-curvature concrete arch dam, 420 ft high, and underground power house to accommodate 6 turbogenerators, each of 100-Mw capacity; design and construction was completed in 4 1/2 yr; construction of dam provided lake of 2000 sq mi; planning and organization of construction work.
Zambezi hydro-electric development at Kariba, first stage
Instn Civ Engrs -- Proc
Anderson, D. (author) / Paton, T.A.L. (author) / Blackburn, C.L. (author)
1960
22 pages
2 Plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Zambezi power development at Kariba -- 600mw in £75m. First stage
Engineering Index Backfile | 1960
|Engineering Index Backfile | 1958
|Engineering Index Backfile | 1960
Safety plan for the Zambezi Valley beyond Kariba Dam
British Library Conference Proceedings | 1997
|Kariba dam on Zambezi river: stabilizing the natural plunge pool
Online Contents | 2013
|