A platform for research: civil engineering, architecture and urbanism
Project utilizes 5200 ft of water head in three stages; it comprises two 200 ft high stone masonry dams, unlined, l-p water tunnels, penstocks, and two power plants with total of 216 Mw capacity.
Project utilizes 5200 ft of water head in three stages; it comprises two 200 ft high stone masonry dams, unlined, l-p water tunnels, penstocks, and two power plants with total of 216 Mw capacity.
Kundah hydro-electric project
Water Power
Dharmalingam, A. (author)
Water Power ; 11
1959
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1968
|Engineering Index Backfile | 1964
Engineering Index Backfile | 1949
|Nantahala hydro-electric project
Engineering Index Backfile | 1946
|Engineering Index Backfile | 1931
|