A platform for research: civil engineering, architecture and urbanism
Erosion control dams replace old wooden bridges
Former wooden bridges had to be lengthened or replaced frequently, as banks and bottoms of gullies were unstable; now, old wooden bridges are being replaced with modern concrete erosion control structures; flood water detention type is used when there is adequate silt and water storage available; concrete culvert type with chute outlet is designed to carry full flow of gully through without erosion.
Erosion control dams replace old wooden bridges
Former wooden bridges had to be lengthened or replaced frequently, as banks and bottoms of gullies were unstable; now, old wooden bridges are being replaced with modern concrete erosion control structures; flood water detention type is used when there is adequate silt and water storage available; concrete culvert type with chute outlet is designed to carry full flow of gully through without erosion.
Erosion control dams replace old wooden bridges
Pub Works
Elsea, C.A. (author)
Public Works ; 90
1959
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete bridges replace wooden structures in Australia
Engineering Index Backfile | 1950
|TIBKAT | 1990
|Aluminum panels replace bridge's wooden deck
Engineering Index Backfile | 1948
TIBKAT | 1976
Engineering Index Backfile | 1921
|