A platform for research: civil engineering, architecture and urbanism
New lift-gate system at downstream end of twin canal lock at Cannstatt/Neckar
Gates are of novel turning lift-gate type, and are built of No. 37 steel; mechanical and electrical equipment; aspects of stresses and wear; gates are vertically lifted and turned into horizontal position at end of lifting process; gates have been operated 12,000 times and proved trouble free.
New lift-gate system at downstream end of twin canal lock at Cannstatt/Neckar
Gates are of novel turning lift-gate type, and are built of No. 37 steel; mechanical and electrical equipment; aspects of stresses and wear; gates are vertically lifted and turned into horizontal position at end of lifting process; gates have been operated 12,000 times and proved trouble free.
New lift-gate system at downstream end of twin canal lock at Cannstatt/Neckar
Ein neues Hubtorsystem am Unterhaupt der Doppelschleuse Cannstatt/Neckar
Welt, O. (author) / Schmausser, G. (author)
Bautechnik ; 37
1960
11 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Rosenstein and Wilhelm bridges over the neckar at Stuttgart-Cannstatt
Engineering Index Backfile | 1931
|Blasting of Wilhelm Bridge over the Neckar at Stuttgart-Cannstatt
Engineering Index Backfile | 1930
|