A platform for research: civil engineering, architecture and urbanism
Contractors revamp George Washington bridge
Construction of Manhattan approach to bridge for new 12 lane depressed Trans-Manhattan expressway; 1/2 mi long viaduct provides curving exit from both levels of bridge and comprises concrete columns, 75 ft high, supporting prestressed box girders; at New Jersey side tunnels are being built by "cut-and-cover" method beneath present bridge roadway as part of approach to new lower deck; construction of new lower deck.
Contractors revamp George Washington bridge
Construction of Manhattan approach to bridge for new 12 lane depressed Trans-Manhattan expressway; 1/2 mi long viaduct provides curving exit from both levels of bridge and comprises concrete columns, 75 ft high, supporting prestressed box girders; at New Jersey side tunnels are being built by "cut-and-cover" method beneath present bridge roadway as part of approach to new lower deck; construction of new lower deck.
Contractors revamp George Washington bridge
Excavating Engr
Excavating Engineer ; 54
1960
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
ICE News - Management revamp at Great George Street
Online Contents | 1998
George Washington bridge: Design of superstructure
Engineering Index Backfile | 1933
|Bus terminal at George Washington bridge
Engineering Index Backfile | 1962
|George Washington bridge: Construction of substructure
Engineering Index Backfile | 1933
|George Washington Bridge: Design of towers
Engineering Index Backfile | 1932
|