New blasting method was applied in canal excavation in Sweden; 56 tons of dynamite in 4750 boreholes broke up 36,000 cu yd of rock and lifted 90,000 cu yd of overburden; in one-thousandth of second, current applied through 300 mi of connecting wire started delay elements burning in 12,500 blasting caps. (See also Civ Eng (NY) v 29 n 11 Nov 1959 p 44-5)
New blasting method was applied in canal excavation in Sweden; 56 tons of dynamite in 4750 boreholes broke up 36,000 cu yd of rock and lifted 90,000 cu yd of overburden; in one-thousandth of second, current applied through 300 mi of connecting wire started delay elements burning in 12,500 blasting caps. (See also Civ Eng (NY) v 29 n 11 Nov 1959 p 44-5)
Blasting without removing overburden
World Construction
Brannfors, S. (author)
World Construction ; 12
1959
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Blasting without removing overburden
Engineering Index Backfile | 1959
|Removing overburden with heavy machinery
British Library Online Contents | 1999
|Crossing under a river in Madrid without overburden
British Library Conference Proceedings | 1998
|Analysis of Overburden Structure and Pressure-Relief Effect of Hard Roof Blasting and Cutting
DOAJ | 2019
|Blasting rock underwater without drilling
Engineering Index Backfile | 1934
|