A platform for research: civil engineering, architecture and urbanism
Jaybird tunnel rigs run on rubber
Jaybird tunnel under construction near Placerville, Calif, is horseshoe shaped, 21,100 ft long, and of 14 ft diam; use of fleet of eight diesel powered, rubber tired shuttle cars for hauling muck; advantages of this hauling method; blasting pattern.
Jaybird tunnel rigs run on rubber
Jaybird tunnel under construction near Placerville, Calif, is horseshoe shaped, 21,100 ft long, and of 14 ft diam; use of fleet of eight diesel powered, rubber tired shuttle cars for hauling muck; advantages of this hauling method; blasting pattern.
Jaybird tunnel rigs run on rubber
Western Construction
Western Construction ; 35
1960
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Computer-Controlled Tunnel-Drilling-Rigs
British Library Online Contents | 2005
Twin tunnels test rigs on rubber and rails
Engineering Index Backfile | 1961
Custom rigs speed 1,500-ft-long tunnel to completion
Engineering Index Backfile | 1967
Equipment - Tunnel rigs - A selection of drilling rig manufacturers
Online Contents | 2007
Columns - Editor's Note - Rigs, glorious rigs
Online Contents | 2001