A platform for research: civil engineering, architecture and urbanism
Experience in producing 10-ton rail steel ingots
Changeover to pouring 10-ton ingots made possible faster teeming, and increased productive capacities of mold preparation department and soaking pits; some mechanical properties of rails improved. (see also English translation in Stal in English n 8 Aug 1960 p 564-6)
Experience in producing 10-ton rail steel ingots
Changeover to pouring 10-ton ingots made possible faster teeming, and increased productive capacities of mold preparation department and soaking pits; some mechanical properties of rails improved. (see also English translation in Stal in English n 8 Aug 1960 p 564-6)
Experience in producing 10-ton rail steel ingots
Opyt raboty s 10-t rel'sovym slitkom
Sviridenko, F.F. (author) / Popova, A.N. (author) / Fradina, M.G. (author) / Chernova, A.V. (author) / Tarasova, L.P. (author)
Stal ; 20
1960
3 pages
Article (Journal)
Russian
© Metadata Copyright Elsevier B. V. All rights reserved.
Experience in producing 10-ton rail steel ingots
Engineering Index Backfile | 1960
|Steel rails from sink-head and ordinary rail ingots
TIBKAT | 1921
|Engineering Index Backfile | 1932
|Engineering Index Backfile | 1906
|Engineering Index Backfile | 1963
|