A platform for research: civil engineering, architecture and urbanism
Stabilizing a bluff
Method used on US Route 101 in San Diego County, Calif comprised stage construction stabilization program using rock fill backed by earth at base of cliff, and installation of 800 ft of perforated metal pipe underdrains along eastern side of highway to intercept and carry drainage waters across highway and deposit them where they could not endanger cliff.
Stabilizing a bluff
Method used on US Route 101 in San Diego County, Calif comprised stage construction stabilization program using rock fill backed by earth at base of cliff, and installation of 800 ft of perforated metal pipe underdrains along eastern side of highway to intercept and carry drainage waters across highway and deposit them where they could not endanger cliff.
Stabilizing a bluff
Better Roads
Better Roads ; 30
1960
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Stabilizing lake Michigan bluff
Engineering Index Backfile | 1936
|Online Contents | 1997
Wiley | 2019
|Aeroelasticity of Bluff Bodies
NTIS | 1992
|Perspectives on bluff-body aerodynamics
Online Contents | 1994
|