A platform for research: civil engineering, architecture and urbanism
Salt Lake city freeway requires -- Building West's toughest fill
Bad subsoil conditions indicated construction of 30 ft high embankment which by its enormous weight, will bring about 90% of expected 6 ft of settlement in first year; application of sand drains and pervious zones in embankment to hasten dewatering.
Salt Lake city freeway requires -- Building West's toughest fill
Bad subsoil conditions indicated construction of 30 ft high embankment which by its enormous weight, will bring about 90% of expected 6 ft of settlement in first year; application of sand drains and pervious zones in embankment to hasten dewatering.
Salt Lake city freeway requires -- Building West's toughest fill
Western Construction
Western Construction ; 35
1960
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Utah's toughest freeway project
Engineering Index Backfile | 1968
Dredge fill for scenic freeway
Engineering Index Backfile | 1948
Huge fill spans Great Salt Lake
Engineering Index Backfile | 1957
|Salt Lake City Hardware, Salt Lake City
British Library Online Contents | 1998
British Library Online Contents | 2007
|