A platform for research: civil engineering, architecture and urbanism
History of river basin development; because flows of river vary annually from 5,500,000 to 25,000,000 acre-ft, large storage reservoirs must be built; purpose will be served by Glen Canyon and Flaming Gorge arch dams, by Navajo earth and rockfill dam, and by three dams in planning stage on Gunnison River; total of 1,200,000-kw will be produced.
History of river basin development; because flows of river vary annually from 5,500,000 to 25,000,000 acre-ft, large storage reservoirs must be built; purpose will be served by Glen Canyon and Flaming Gorge arch dams, by Navajo earth and rockfill dam, and by three dams in planning stage on Gunnison River; total of 1,200,000-kw will be produced.
Development of upper Colorado river
AWWA -- J
Larson, E.O. (author)
1959
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Development of the Upper Colorado River
Wiley | 1959
|Development of Colorado River in Upper Basin
Engineering Index Backfile | 1939
|Upper Colorado River project -- 1
Engineering Index Backfile | 1961
|Water for upper Colorado River Basin
Engineering Index Backfile | 1959
|Development of the Colorado River in the Upper Basin
ASCE | 2021
|