A platform for research: civil engineering, architecture and urbanism
Construction of Glen Canyon Dam, one of 3 dams in Upper Colorado scheme; 700 ft high, 1500 ft long arch dam will impound 186 mi length of Colorado River and 71 mi length of San Juan River; dam will serve power plant of 900 Mw capacity; construction of two 46 ft diam diversion tunnels and 2 spillway tunnels with 40×52 ft radial gates; description of excavations, aggregate quarrying, concrete batching and concreting, and cableway structure over canyon.
Construction of Glen Canyon Dam, one of 3 dams in Upper Colorado scheme; 700 ft high, 1500 ft long arch dam will impound 186 mi length of Colorado River and 71 mi length of San Juan River; dam will serve power plant of 900 Mw capacity; construction of two 46 ft diam diversion tunnels and 2 spillway tunnels with 40×52 ft radial gates; description of excavations, aggregate quarrying, concrete batching and concreting, and cableway structure over canyon.
Upper Colorado River project -- 1
Water Power
Mackintosh, I.B. (author)
Water Power ; 13
1961
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Colorado River storage project
Engineering Index Backfile | 1950
Development of upper Colorado river
Engineering Index Backfile | 1959
|Water for upper Colorado River Basin
Engineering Index Backfile | 1959
|Development of the Upper Colorado River
Wiley | 1959
|Energy-Water-Salinity: Upper Colorado River Basin
ASCE | 2021
|