Bored pile foundations
Piling system employs crawler mounted excavator adapted to drive heavy duty auger suspended from boom; auger digs into ground and is then withdrawn carrying excavated material with it; auger shaft is square hollow box cross section with inner section sliding between outer one so that 80 ft drilling depths can be obtained using 60 ft boom; system avoids constructing pile caps thereby reducing labor costs, and provides knowledge of soil at excavation base; speeds of 20 ft/hr can be achieved.
Bored pile foundations
Piling system employs crawler mounted excavator adapted to drive heavy duty auger suspended from boom; auger digs into ground and is then withdrawn carrying excavated material with it; auger shaft is square hollow box cross section with inner section sliding between outer one so that 80 ft drilling depths can be obtained using 60 ft boom; system avoids constructing pile caps thereby reducing labor costs, and provides knowledge of soil at excavation base; speeds of 20 ft/hr can be achieved.
Bored pile foundations
Roads Road Construction
1959
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1962
|House foundations: short-bored pile
Engineering Index Backfile | 1952
|Case Histories of Bored Pile Foundations 1.16
British Library Conference Proceedings | 1993
|The influence of a bored tunnel on pile foundations
British Library Conference Proceedings | 1994
|Base deformations calculation of bored pile foundations with widenings
British Library Conference Proceedings | 1998
|