A platform for research: civil engineering, architecture and urbanism
Iron ore deposit lay underneath lake and was covered with 161,000,000 cu yd of lake bottom material mainly silt; removal of this material was done on contract dredging basis; plant phase consisted of supplying 2 cutter type suction dredges, each with 2 booster pumps in discharge lines; steel tower line and tugs; removal of lake bottom material resulted in lake being lowered from elevation 1120 to 651; in 1960, 765,000 tons of iron ore were shipped.
Iron ore deposit lay underneath lake and was covered with 161,000,000 cu yd of lake bottom material mainly silt; removal of this material was done on contract dredging basis; plant phase consisted of supplying 2 cutter type suction dredges, each with 2 booster pumps in discharge lines; steel tower line and tugs; removal of lake bottom material resulted in lake being lowered from elevation 1120 to 651; in 1960, 765,000 tons of iron ore were shipped.
Caland dredging project
Can Min Met Bul
Scott, N.S. (author)
1961
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Preliminary engineering and water control at Caland
Engineering Index Backfile | 1961
|The Caland Tunnel - innovative solutions in immersed tunnelling
British Library Conference Proceedings | 2003
|IHC Caland reports major rise in net profit
Online Contents | 1997
Caland Canal wind barrier, nr Rotterdam: Maarten Struijs
British Library Online Contents | 1999
IHC Caland steps in for troubled shipyard
Online Contents | 1997