A platform for research: civil engineering, architecture and urbanism
Preliminary engineering and water control at Caland
To prevent inflow of runoff water from 25 sq mi catchment area into mining area, Caland has some 15 dams and related facilities at its Steep Rock Lake, Ont, iron ore property; auxiliary to dams are 6 rock tunnels totalling over 4000 ft in length; where gravity diversion was not feasible, pumps with combined capacity in excess of 100,000 gpm were installed.
Preliminary engineering and water control at Caland
To prevent inflow of runoff water from 25 sq mi catchment area into mining area, Caland has some 15 dams and related facilities at its Steep Rock Lake, Ont, iron ore property; auxiliary to dams are 6 rock tunnels totalling over 4000 ft in length; where gravity diversion was not feasible, pumps with combined capacity in excess of 100,000 gpm were installed.
Preliminary engineering and water control at Caland
Min Congress J
Ribotto, P.P. (author)
1961
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1961
|The Caland Tunnel - innovative solutions in immersed tunnelling
British Library Conference Proceedings | 2003
|IHC Caland reports major rise in net profit
Online Contents | 1997
Caland Canal wind barrier, nr Rotterdam: Maarten Struijs
British Library Online Contents | 1999
IHC Caland steps in for troubled shipyard
Online Contents | 1997