A platform for research: civil engineering, architecture and urbanism
Oraison project on Middle-Durance
July n 7 p 329-38: Dam consists of concrete structure in river bed with adjoining abutments; concrete structure is called "movable barrage" and it comprises 5 lower sluices with taint or gates and 5 upper gated overflows; 21,500 m long concrete lined headrace tunnel and canal; power plant with 3 Francis units of 58 Mw. Aug n 8 p 370-8: 12 m diam tailrace tunnel supplies water to 2 other power plants of scheme. Sept n 9 p 421-4: Model studies; tunneling works.
Oraison project on Middle-Durance
July n 7 p 329-38: Dam consists of concrete structure in river bed with adjoining abutments; concrete structure is called "movable barrage" and it comprises 5 lower sluices with taint or gates and 5 upper gated overflows; 21,500 m long concrete lined headrace tunnel and canal; power plant with 3 Francis units of 58 Mw. Aug n 8 p 370-8: 12 m diam tailrace tunnel supplies water to 2 other power plants of scheme. Sept n 9 p 421-4: Model studies; tunneling works.
Oraison project on Middle-Durance
L'amenagement d'Oraison sur la Moyenne-Durance
Cordelle, F. (author) / Menet, J. (author)
Construction ; 16
1961
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1957
|Engineering Index Backfile | 1892
|Online Contents | 2011
French dual-purpose scheme; Durance project and Serre Poncon dam
Engineering Index Backfile | 1957
|Theater Durance in Chateau-Arnoux
British Library Online Contents | 2009
|