A platform for research: civil engineering, architecture and urbanism
Operation south fork
Description of power and irrigation project which includes 3 power plants, 6 dams and 6 major tunnels; there are 3 earth dams, highest 275 ft and 3 small concrete arch dams, highest 91 ft; total length of 10 to 12 ft diam horseshoe tunnels is 89,000 ft; 3 single unit powerhouses comprise 52,000 kw, 29,000 kw and 9000 kw generators; after passing powerhouses part of water is diverted into irrigation channels.
Operation south fork
Description of power and irrigation project which includes 3 power plants, 6 dams and 6 major tunnels; there are 3 earth dams, highest 275 ft and 3 small concrete arch dams, highest 91 ft; total length of 10 to 12 ft diam horseshoe tunnels is 89,000 ft; 3 single unit powerhouses comprise 52,000 kw, 29,000 kw and 9000 kw generators; after passing powerhouses part of water is diverted into irrigation channels.
Operation south fork
Western Construction
Western Construction ; 36
1961
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1889
ASCE | 2021
|Unique contract near Oroville -- South Fork project
Engineering Index Backfile | 1961
|Middle Fork and South Fork of the Upper Rogue River Watershed analysis ; Forks Watershed analysis
BASE | 1998
|