A platform for research: civil engineering, architecture and urbanism
Wellpoints Tame river for easy digging
Eufaula Dam will be 3180 ft long, 112 ft high with 520 ft long concrete spillway and powerhouse section; excavation and construction 40 ft below river level, in dry, protected by 2 stage wellpoint system; dam will impound 3,848,000 acre-ft; power plant will produce 90,000 kw.
Wellpoints Tame river for easy digging
Eufaula Dam will be 3180 ft long, 112 ft high with 520 ft long concrete spillway and powerhouse section; excavation and construction 40 ft below river level, in dry, protected by 2 stage wellpoint system; dam will impound 3,848,000 acre-ft; power plant will produce 90,000 kw.
Wellpoints Tame river for easy digging
Excavating Engr
Excavating Engineer ; 55
1961
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed-concrete bridge over river Tame
Engineering Index Backfile | 1950
Prestressed-concrete bridge over river Tame
Engineering Index Backfile | 1950
Prestressed-concrete bridge over river Tame
Engineering Index Backfile | 1950
Prestressed-concrete bridge over river Tame
Engineering Index Backfile | 1950
West Coast route modernisation: River Tame viaduct
Online Contents | 2007
|