Glen Canyon dam project
Paper is progress report and summary of features of design and construction; use of unique 12 cu yd buckets for placing of concrete carried by 50 ton capacity cableways with movable towers; 217 ft high batch plant of 480 cu yd/hr capacity; 1450 tph aggregate plant; use of steel forms with thermal insulation; construction city of 6000 population; refrigeration facilities for cooling of concrete; detailed description of equipment. (p 37-45, 48, 50, 54, 56, 58, 62, 64, 68, 70, 72)
Glen Canyon dam project
Paper is progress report and summary of features of design and construction; use of unique 12 cu yd buckets for placing of concrete carried by 50 ton capacity cableways with movable towers; 217 ft high batch plant of 480 cu yd/hr capacity; 1450 tph aggregate plant; use of steel forms with thermal insulation; construction city of 6000 population; refrigeration facilities for cooling of concrete; detailed description of equipment. (p 37-45, 48, 50, 54, 56, 58, 62, 64, 68, 70, 72)
Glen Canyon dam project
Western Construction
Western Construction ; 36
1961
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1960
|NTIS | 2006
|Engineering Index Backfile | 1961
|Engineering Index Backfile | 1957