A platform for research: civil engineering, architecture and urbanism
On-site casting yard mass produces prestressed piles and beams
Prestressed concrete members will go into bridge at Biloxi, Miss; it requires 128,000 ft of piles and 1512 52-ft long beams; in plant hydraulically operated 40 ton gantry spans 60 ft; it is used for forming and stripping and pouring concrete; it also stockpiles finished bridge members at one end of prestress yard, then loads them into barges for transportation to bridge site.
On-site casting yard mass produces prestressed piles and beams
Prestressed concrete members will go into bridge at Biloxi, Miss; it requires 128,000 ft of piles and 1512 52-ft long beams; in plant hydraulically operated 40 ton gantry spans 60 ft; it is used for forming and stripping and pouring concrete; it also stockpiles finished bridge members at one end of prestress yard, then loads them into barges for transportation to bridge site.
On-site casting yard mass produces prestressed piles and beams
Construction Methods Equipment
1961
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1968
|Engineering Index Backfile | 1962
|Engineering Index Backfile | 1968
|Engineering Index Backfile | 1962
|Prestressed-concrete sheet piles
Engineering Index Backfile | 1952