A platform for research: civil engineering, architecture and urbanism
Complex conveyor system places concrete in tight quarters
Description of concreting works of new pumping station at Chicago's new water filtration plant; 1300 ft of conveyors were assembled on site to move 50,000 yd of concrete and they transported concrete over distances as great as 800 ft; conventional pouring practices have not been feasible because of lack of working space.
Complex conveyor system places concrete in tight quarters
Description of concreting works of new pumping station at Chicago's new water filtration plant; 1300 ft of conveyors were assembled on site to move 50,000 yd of concrete and they transported concrete over distances as great as 800 ft; conventional pouring practices have not been feasible because of lack of working space.
Complex conveyor system places concrete in tight quarters
Construction Methods Equipment
1961
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1999
ASCE | 2022
|Service Insertion Preferred In Tight Working Quarters
Online Contents | 1997
A Sideways Pipe Solution for Tight Quarters
Online Contents | 1996
|Constructing four-lane highway in tight quarters
Engineering Index Backfile | 1961
|