A platform for research: civil engineering, architecture and urbanism
Cast-and-Jump builds German bridge
Construction of 59 ft wide 1670 ft long elevated highway with 18 continuous spans by novel variation of cast-and-jump method at Andernach; bridge has 12 pairs of hollow concrete piers of octagonal 6 by 9 ft section; each span comprises two 7 ft deep box girders of prestressed concrete: superstructure is prestressed both ways by Swiss BBVR system; description of continuous assembly by traveling cranes.
Cast-and-Jump builds German bridge
Construction of 59 ft wide 1670 ft long elevated highway with 18 continuous spans by novel variation of cast-and-jump method at Andernach; bridge has 12 pairs of hollow concrete piers of octagonal 6 by 9 ft section; each span comprises two 7 ft deep box girders of prestressed concrete: superstructure is prestressed both ways by Swiss BBVR system; description of continuous assembly by traveling cranes.
Cast-and-Jump builds German bridge
Eng News-Rec
Engineering News-Record ; 165
1960
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Seattle builds pre-cast seawall
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1942
|Baltimore county builds covered bridge
Engineering Index Backfile | 1963
|Builds penta-treated overhead bridge
Engineering Index Backfile | 1952
Vermont builds floating timber bridge
Engineering Index Backfile | 1940