A platform for research: civil engineering, architecture and urbanism
Auger and fancy forms lick tough piers
Construction of column piers of Duluth-Superior Bridge, Minn; soil difficulties included deep fill of old lumber mill wastes, areas where piles could not be driven even by hammer delivering 80,000 ft/lb of energy, and boiling up of material around bottom piles where high pressure jet was used as help in piling; use of prefabricated steel forms for concreting of 103 ft high columns; crawler crane positioned forms and handled pours; for pier caps, 22 ton forms were used.
Auger and fancy forms lick tough piers
Construction of column piers of Duluth-Superior Bridge, Minn; soil difficulties included deep fill of old lumber mill wastes, areas where piles could not be driven even by hammer delivering 80,000 ft/lb of energy, and boiling up of material around bottom piles where high pressure jet was used as help in piling; use of prefabricated steel forms for concreting of 103 ft high columns; crawler crane positioned forms and handled pours; for pier caps, 22 ton forms were used.
Auger and fancy forms lick tough piers
Construction Methods Equipment
1961
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fancy falsework, forms for bridge
Engineering Index Backfile | 1949
Deep cofferdams and pumpcrete whip tough mystic river piers
Engineering Index Backfile | 1949
Engineering Index Backfile | 1956
Shop-fabricated forms build bridge piers
Engineering Index Backfile | 1947
Lick-Wilmerding High School, San Francisco
British Library Online Contents | 2004
|