A platform for research: civil engineering, architecture and urbanism
Deep cofferdams and pumpcrete whip tough mystic river piers
11,900 ft steel truss roadway bridge in Boston, Mass, divided into 800 ft center span and two cantilevers, 362 ft each; foundation of south pier running 83 ft to bedrock endangered wood piles of adjacent old bridge and necessitated careful procedure; excavation inside cofferdam performed by siphon; concrete was placed by tremie pour; concreting up to 132 ft above water by pumpcreting; construction stages shown.
Deep cofferdams and pumpcrete whip tough mystic river piers
11,900 ft steel truss roadway bridge in Boston, Mass, divided into 800 ft center span and two cantilevers, 362 ft each; foundation of south pier running 83 ft to bedrock endangered wood piles of adjacent old bridge and necessitated careful procedure; excavation inside cofferdam performed by siphon; concrete was placed by tremie pour; concreting up to 132 ft above water by pumpcreting; construction stages shown.
Deep cofferdams and pumpcrete whip tough mystic river piers
Construction Methods Equipment
1949
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
A plan for building cofferdams for river piers
Engineering Index Backfile | 1906
|Building cofferdams for Arlington bridge piers
Engineering Index Backfile | 1928
Steel piling cofferdams for bridge piers
Engineering Index Backfile | 1906
Single bridge piers built in cellular cofferdams
Engineering Index Backfile | 1951
|Single bridge piers built in cellular cofferdams
Engineering Index Backfile | 1951
|