A platform for research: civil engineering, architecture and urbanism
BR mark IIB coaches
Detailed improvements to British Mark II integral coach body include wrap-round end doors to increase width of opening to nominal width of 3 ft; polyester-molded wrap-round doors are constructed with inner and outer skin encapsulating steel strengthening frame from which door is hung by three self-aligning hinges. (24402)
BR mark IIB coaches
Detailed improvements to British Mark II integral coach body include wrap-round end doors to increase width of opening to nominal width of 3 ft; polyester-molded wrap-round doors are constructed with inner and outer skin encapsulating steel strengthening frame from which door is hung by three self-aligning hinges. (24402)
BR mark IIB coaches
Ry Gaz
Railway Gazette ; 125
1969
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
Dome coaches for twin "Zephyrs"
Engineering Index Backfile | 1947
Trolley coaches cause pavement wear
Engineering Index Backfile | 1950
|Collision effects on lightweight coaches
Engineering Index Backfile | 1938
Green line coaches and country buses
Engineering Index Backfile | 1941