Construction of Nagoya harbor storm-tide-preventing breakwater
Geology at construction site of breakwater presented highly unstable foundation for breakwater; in order to improve soft clay formation, sand drain method was employed; rubble mound was constructed on improved layer and breakwater was built by settling reinforced concrete caissons on mound, whole being thus composite breakwater. (40998)
Construction of Nagoya harbor storm-tide-preventing breakwater
Geology at construction site of breakwater presented highly unstable foundation for breakwater; in order to improve soft clay formation, sand drain method was employed; rubble mound was constructed on improved layer and breakwater was built by settling reinforced concrete caissons on mound, whole being thus composite breakwater. (40998)
Construction of Nagoya harbor storm-tide-preventing breakwater
Kon Vlaam Ing, Papers
Miyazaki, T. (author)
5th International Harbour Congress ; 1968 ; Belgium , Antwerp
1968
18 pages
Conference paper
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Nagoya storm-tide-preventing breakwater
Engineering Index Backfile | 1966
|Port Arthur harbor breakwater construction
Engineering Index Backfile | 1931
St. George Harbor: Berm Breakwater Construction Considerations
British Library Conference Proceedings | 2002
|