A platform for research: civil engineering, architecture and urbanism
Thames to Lee Valley raw water tunnel main of metropolitan water board
Description of construction of 102 in. diam 19 mi long water tunnel through London clay at depth to enable gravity flow from Hampton to terminal shaft near Lockwood Reservoir; tunnel main is designed to carry 120 mgd and its construction is of special interest because of development of lining technique utilizing unbolted concrete segments.
Thames to Lee Valley raw water tunnel main of metropolitan water board
Description of construction of 102 in. diam 19 mi long water tunnel through London clay at depth to enable gravity flow from Hampton to terminal shaft near Lockwood Reservoir; tunnel main is designed to carry 120 mgd and its construction is of special interest because of development of lining technique utilizing unbolted concrete segments.
Thames to Lee Valley raw water tunnel main of metropolitan water board
Water Water Eng
1960
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1962
|Thames Water, Metropolitan Water Division : a description of the undertaking
UB Braunschweig | 1980
Pumping from the Thames Water Ring Main
British Library Conference Proceedings | 2008
|Pumping from the thames water ring main
Tema Archive | 2008
|