A platform for research: civil engineering, architecture and urbanism
Construction of Milan underground
Line 12.5 km long forms beginning of system of 36.5 km length; 6-coach trains holding nearly 1300 passengers will carry up to 20,000 passengers/day; bentonite slurry is used for hydrostatically shoring up trenches for tunnel walls; roof is excavated after walls are concreted.
Construction of Milan underground
Line 12.5 km long forms beginning of system of 36.5 km length; 6-coach trains holding nearly 1300 passengers will carry up to 20,000 passengers/day; bentonite slurry is used for hydrostatically shoring up trenches for tunnel walls; roof is excavated after walls are concreted.
Milan 97: Milan Furniture Fair
British Library Online Contents | 1997
Online Contents | 2014
|TIBKAT | 2009
|Asnago Vender and the construction of modern Milan
UB Braunschweig | 2014
|