A platform for research: civil engineering, architecture and urbanism
Western Avenue, Lagos -- Design and construction of soil-cement pavement
Construction of 2.7 mi road under hot and humid climate of Federation of Nigeria; pavement consists of 6 in. thick sub-base of equal proportions of sandy clay and lagoon-sand stabilized with 7 1/2% cement; sandy clay was typical of subgrade soils of area and was won from borrow area beside road; surfacing consisted of 1.25 in. thick premix carpet using heavy grade cutback bitumen.
Western Avenue, Lagos -- Design and construction of soil-cement pavement
Construction of 2.7 mi road under hot and humid climate of Federation of Nigeria; pavement consists of 6 in. thick sub-base of equal proportions of sandy clay and lagoon-sand stabilized with 7 1/2% cement; sandy clay was typical of subgrade soils of area and was won from borrow area beside road; surfacing consisted of 1.25 in. thick premix carpet using heavy grade cutback bitumen.
Western Avenue, Lagos -- Design and construction of soil-cement pavement
Instn Civ Engrs -- Proc
Johnston, C.M. (author)
1961
34 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1969
|Unit-construction footbridge over western avenue at Greenford
Engineering Index Backfile | 1938
Unit-construction footbridge over western avenue at Greenford
Engineering Index Backfile | 1938
Western avenue tunnel extension
Engineering Index Backfile | 1922
Lincoln Avenue Reclaimed Asphalt Pavement Base Project
British Library Conference Proceedings | 1996
|